LaTeX templates and examples — Theses
LaTeX thesis templates to help you navigate an important step in your career. These thesis templates, many provided by universities as official layout guidelines, include sections to add author information, along with placeholder chapters for your introduction, background, method, results, conclusion / discussion, references, and appendices.
Recent

A template for fithesis4, the document class for the typesetting of theses at the Masaryk University (Brno, Czech Republic). For more information about the class, see https://www.fi.muni.cz/lemma/projekty/fithesis#fithesis.
![[Federal University of Technology — Paraná] UTFPR-Thesis](https://writelatex.s3.amazonaws.com/published_ver/45868.jpeg?X-Amz-Expires=14400&X-Amz-Date=20260502T122943Z&X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Credential=AKIAWJBOALPNFPV7PVH5/20260502/us-east-1/s3/aws4_request&X-Amz-SignedHeaders=host&X-Amz-Signature=9a20ab3fd465eb86df5f38128cf9013481cede14386db1384181b1bc2bf1739c)
This LaTeX template (unofficial) allows the production of academic works (doctoral, master, and bachelor theses, among others) of the Federal University of Technology — Paraná (UTFPR). It was developed using the memoir LaTeX class, to meet the requirements of the Brazilian Association of Technical Standards (ABNT) for the development of Brazilian technical and scientific documents. Also, several code snippets of the abnTeX2 LaTeX class and others developed by users of the TeX-LaTeX Stack Exchange were used. Status: added by Luiz E. M. Lima, maintenance on demand. Last updated: August 3, 2025 (Version 2.2). Este modelo LaTeX (não oficial) permite a produção de trabalhos acadêmicos (teses, dissertações, trabalhos de conclusão, entre outros) da Universidade Tecnológica Federal do Paraná (UTFPR). Foi desenvolvido utilizando a classe LaTeX memoir, de modo a atender aos requisitos da Associação Brasileira de Normas Técnicas (ABNT) para o desenvolvimento de documentos técnicos e científicos brasileiros. Além disso, diversos trechos de códigos da classe LaTeX abnTeX2 e outros desenvolvidos por usuários do TeX-LaTeX Stack Exchange foram usados. Estado: adicionado por Luiz E. M. Lima, manutenção sob demanda. Última atualização: 3 de agosto de 2025 (Versão 2.2).

VISTEC Thesis Template (Academic year 2025 onwards) This is the official template (two-side printing) for the final report/dissertation of the MEng and PhD programs at the Vidyasirimedhi Institute of Science and Technology (VISTEC). The official guideline is available on (internal access): GRA Guideline Version: 2.0.2 Note: This project is publicly available on GitHub

Plantilla per a la realització de la memòria dels TFG de l'EPS (https://eps.uib.es/estudiants/treball-de-fi-de-grau/)

本文为湖北大学理工科研究生毕业论文模板,请务必打开之后在左上角菜单栏中切换编译器,依据湖北大学研究生毕业论文格式要求整理,详情及联系方式请见摘要模板主页:https://gs.hubu.edu.cn/info/1033/10246.htm

This is the thesis template for the Chairs of Digital Innovation and the Public Sector, Machine Learning and Data Engineering, and Information Systems and Business Process Management from the University of Münster. Further information can be found on the department website: https://www.wi.uni-muenster.de/student-affairs/theses https://www.wi.uni-muenster.de/department/dips/procedure-writing-your-thesis https://www.wi.uni-muenster.de/student-affairs/downloads

Template from ICT TU Wien. It can be configured for report, bachelor thesis, master thesis, PhD thesis and habilitation. Languages: English, German

Updated 16/07/2025: Fixed acro longtable issue by switching to supertabular. Compiling with latex >2021 still takes ages. Updated 14/03/2025: - Downgraded texlive version to 2021 and acro package version to v2 to reduce compile time. Updated 21/02/2025: - Meets latest GRS requirements https://policies.latrobe.edu.au/download.php?id=80&version=15&associated - Added backref & ref check packages. Backref may need to be disabled prior to submission to meet GRS requirements. Updated 07/07/2024: - Changed title page to meet GRS requirements - Changed TOC to include subsubsections Updated: 20/09/2022 - Fixed some error messages, suppressed some warnings. Updated: 10/03/2022 - Changed acronym package to acro package This thesis is based on the classic thesis template made by André Miede, which was modified in turn by Matthias Langer to fit La Trobe's guidelines are they don't provide a template. I modified it slightly further to change to margins to fit the department of physics requirements, in addition to changing the language to Australian and adding a page for acronyms. I've since added plotting examples using python. This is released under the GNU General Public License v2.0. I

This is a dissertation template for the University of Wisconsin-Madison which builds on the memoir class. It follows this official formatting guideline by the UW-Madison graduate school: https://grad.wisc.edu/wp-content/uploads/sites/329/2023/04/Formatting-Requirements-for-your-Doctoral-Dissertation.pdf This template is modified from the original awesome template by Will Benton, improving the font, modernizing the styling within limits, and adding helper macros. Source: https://github.com/WiscADSL/Wisc-Dissertation Source of the base template: https://github.com/willb/wi-thesis-template
\begin
Discover why over 25 million people worldwide trust Overleaf with their work.